CLARION Data projects

Browse this record in the Atlas

Facility · Evidence reviewed 2026-10-06

Hut 8 Mississauga

Hut 8 · Mississauga, Ontario

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6075357 · CC BY 4.0

Location

Reported

Hut 8 markets its Mississauga data centre in Ontario. This establishes an operator offering, not a fresh commissioning or title verification.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Operator marketed facility identity

Ownership

Reported

Opti9’s September 2026 acquisition release says Hut 8 retained its Canadian data centres and GPU/HPC business, while Opti9 acquired managed-cloud operations and entered a multiyear colocation agreement. No site-by-site tenancy allocation is disclosed.

Evidence date
2026-09-03
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship

Power

Operating

Hut 8 describes two independent utility-substation feeds, 900 kW UPS per side in 2N, and ten diesel generators totaling 7 MW with over 24 hours of fuel. Redundant/backup ratings are not usable IT MW.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope

Cooling

Marketed

The operator describes N+1 cooling across its network. This does not independently establish a site-specific installed liquid-cooling inventory.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope