Project · Evidence reviewed 2026-10-06
Yondr Toronto data centre
Yondr Group · Toronto, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Yondr Group
- Operator: Yondr Group
- Province: Yondr Group
- City: Yondr Group
- Record kind: Yondr Group
- Disposition: Yondr Group
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6167865 · CC BY 4.0
Development
Reported milestonesYondr announced a Toronto groundbreaking on January 29, 2025. Its July 9, 2026 update describes completed operations-team training, without a formal ready-for-service acceptance.
- Evidence date
- 2026-07-09
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Project milestone at stated scope
Location
ReportedYondr identifies the project in Toronto, Ontario; the directory-only Steeles Avenue address is omitted.
- Evidence date
- 2025-01-29
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
Capacity
PlannedYondr described a planned 27 MW Toronto facility in its January 2025 announcement. The retained materials do not quantify energized usable IT power.
- Evidence date
- 2025-01-29
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Unspecified power
- Basis
- announced project design; energized usable IT amount not established
- Reported quantity
- 27 MW
Cooling
PlannedThe 2025 design announcement describes a closed chilled-water loop intended to avoid continuing water consumption for cooling after fill.
- Evidence date
- 2025-01-29
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
Ownership
ReportedYondr announced securing the Toronto development site in December 2024 and identifies itself as project developer.
- Evidence date
- 2024-12-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship