Project · Evidence reviewed 2026-10-06
Urbacon Toronto DC4
Urbacon Data Centre Solutions · Richmond Hill, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Urbacon Data Centre Solutions
- Operator: Urbacon Data Centre Solutions
- Province: Urbacon Data Centre Solutions
- City: Urbacon Data Centre Solutions
- Record kind: Urbacon Data Centre Solutions
- Disposition: Urbacon Data Centre Solutions
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6122091 · CC BY 4.0
Location
ReportedUDCS locates DC4 at Barker Business Park in Richmond Hill, Ontario; no street number is assigned.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- DC4 - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Lifecycle
Under constructionUDCS’s undated available-sites page describes DC4 as under construction.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Available Sites - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Capacity
PlannedUDCS advertises up to 36 MW of critical IT/design power for DC4, not commissioned IT capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- It design capacity
- Basis
- operator-advertised design/planned critical IT capacity
- Reported quantity
- 36 MW · up_to
- Toronto, Canada - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
- DC4 - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Capacity
ReportedUDCS says 40 MW of total power is secured for DC4. This is not an independently verified utility commitment or usable-IT figure.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility supply
- Basis
- operator-reported total power secured
- Reported quantity
- 40 MW
- Available Sites - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Cooling
PlannedUDCS advertises free-air, liquid-cooled and hybrid design options; the final commissioned cooling system is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Available Sites - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Ownership
ReportedUrbacon Data Centre Solutions markets and develops the project; the legal titleholding entity is not named.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- DC4 - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Power readiness
ReportedUDCS reports an approved permit, completed civil works and power energized at the DC4 site; no usable-IT acceptance document is supplied.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power milestone at stated scope
- Toronto, Canada - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
- Available Sites - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Commercial
ReportedThe operator markets DC4 for lease; no specific executed customer lease or vacant MW is disclosed.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Marketed service
- DC4 - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
Connectivity
ReportedUDCS reports fibre at site and possible future inter-facility connections, without proof that all contemplated routes are commissioned.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity at stated scope
- Toronto, Canada - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions
- Available Sites - Urbacon Data Centre Solutions · Urbacon Data Centre Solutions