Facility · Evidence reviewed 2026-10-06

Urbacon Toronto DC1

Urbacon Data Centre Solutions · Richmond Hill, Ontario

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6122091 · CC BY 4.0

Location

Reported

UDCS identifies Toronto DC1 in Richmond Hill, Ontario; the street address is not confirmed by the retained source.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Lifecycle

Historical completed

UDCS dates project completion to 2017-08. Present operation is separately described on its undated operating-facilities roster.

Evidence date
2017-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Capacity

Reported

UDCS reports 10 MW of critical power for DC1. The figure is not current metered demand or verified vacant capacity.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Critical power
Basis
operator-reported facility critical-power rating
Reported quantity
10 MW

Ownership

Reported

UDCS identifies this facility within its developed and operated data-centre estate; registered title is not separately established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship

Power

Reported

UDCS reports lithium-ion batteries for critical backup in the DC1 project.

Evidence date
2017-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration

Cooling

Reported

UDCS describes Kyoto Cooling at DC1 and claims a 1.15 PUE for phase 1; this is a project-specific historical report.

Evidence date
2017-08
Checked
2026-10-05
Scope
Facility · phase 1
Evidence type
Reported
Status describes
Cooling system at stated scope