Phase · Evidence reviewed 2026-10-06
STACK TOR01A
STACK Infrastructure · Toronto, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: EllisDon, NBIZ Contracting Group Ltd.
- Operator: EllisDon, NBIZ Contracting Group Ltd.
- Province: EllisDon, NBIZ Contracting Group Ltd.
- City: EllisDon, NBIZ Contracting Group Ltd.
- Record kind: EllisDon, NBIZ Contracting Group Ltd.
- Disposition: EllisDon, NBIZ Contracting Group Ltd.
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6167865 · CC BY 4.0
Location
ReportedTOR01A is a phase of STACK’s Toronto data-centre campus.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Published location reference
- STACK TOR01 · EllisDon
- STACK Infrastructure TOR01A · NBIZ Contracting Group Ltd.
Ownership
ReportedEllisDon identifies STACK as the campus client and itself as construction contractor.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- STACK TOR01 · EllisDon
Capacity
Reported deliveredEllisDon reports 4 MW of initial critical-load capacity delivered in TOR1A.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · initial TOR1A
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Critical load
- Basis
- critical load
- Reported quantity
- 4 MW · contractor reported; source undated
- STACK TOR01 · EllisDon
Capacity
PlannedA later TOR1A phase is described as underway toward 8 MW total critical-load capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · TOR1A total
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Critical load
- Basis
- critical load
- Reported quantity
- 8 MW · planned total, includes initial 4 MW
- STACK TOR01 · EllisDon