Facility · Evidence reviewed 2026-10-06
eStruxture TOR-5
eStruxture · Barrie, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: eStruxture
- Operator: eStruxture
- Province: eStruxture
- City: eStruxture
- Record kind: eStruxture
- Disposition: eStruxture
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5894171 · CC BY 4.0
Location
ReportedBarrie, Ontario; marketed as the Toronto North location.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- eStruxture TOR-5 facility page · eStruxture
Capacity
ReportedeStruxture advertises 10 MW total capacity; the page does not specify the IT-versus-utility basis.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity assertion
- Quantity type
- Unspecified power
- Basis
- scalable total power; IT-versus-utility basis unspecified
- Reported quantity
- 10 MW
- eStruxture TOR-5 facility page · eStruxture
Cooling
ReportedThe operator describes free-air cooling with at least N+1 unit redundancy.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- eStruxture TOR-5 facility page · eStruxture