CLARION Data projects

Browse this record in the Atlas

Facility · Evidence reviewed 2026-10-06

Cologix TOR3

Cologix · Toronto, Ontario

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6167865 · CC BY 4.0

Location

Reported

905 King Street West, Toronto, Ontario; TOR3 is described as an expansion on the TOR2 campus.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Capacity

Reported

Cologix advertises 2 MW with A/B distribution for TOR3; this is not labelled measured IT load.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity assertion
Quantity type
Unspecified power
Basis
TOR3 expansion power with A/B distribution; IT-versus-utility basis unspecified
Reported quantity
2 MW

Cooling

Reported

Cologix lists N+1 chillers and cooling towers, plus in-row cooling with hot-aisle containment.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling configuration