HIVE Grand Falls campus and BUZZ conversion

HIVE Digital Technologies / BUZZ HPC · Grand Falls, New Brunswick

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6621033 · CC BY 4.0

Lifecycle

Conversion planned

In May 2026, HIVE said its Grand Falls mining campus was energized while BUZZ advanced an AI/HPC conversion; AI commissioning was not announced.

Evidence date
2026-05-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Capacity

Reported

The issuer reported 70 MW of energized gross load at Grand Falls.

Evidence date
2026-05-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Reported capacity
Quantity type
Facility power
Basis
issuer-reported energized gross load; not measured demand or AI IT load
Reported quantity
70 MW

Capacity

Planned

BUZZ targeted a 50 MW AI/HPC conversion at the existing campus.

Evidence date
2026-05-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Reported capacity
Quantity type
Unspecified
Basis
conversion target; gross-versus-IT basis not stated
Reported quantity
50 MW

Capacity

Reported

HIVE described an owned 80 MW substation serving the campus.

Evidence date
2025-11-03
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Reported capacity
Quantity type
Utility supply
Basis
substation rating; overlaps campus power and is not additive
Reported quantity
80 MW

Power

Reported

HIVE characterizes Grand Falls power as hydroelectric; this is an issuer environmental description, not proof of exclusive physical hydro delivery.

Evidence date
2025-11-03
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power configuration

Ownership

Historical

The 2021 acquisition announcement identifies HIVE Atlantic Datacentres Ltd., formerly GPU Atlantic Inc., as the acquired facility-owning subsidiary.

Evidence date
2021-04-19
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship

Connectivity

Contracted not delivery verified

HIVE contracted a carrier fibre upgrade, including multiple 100/400 Gbps wavelengths, for approximately US$3.1 million over five years; delivery was expected from Q3 2026.

Evidence date
2026-05-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Connectivity service or plan