Campus · Evidence reviewed 2026-10-06
HIVE Grand Falls campus and BUZZ conversion
HIVE Digital Technologies / BUZZ HPC · Grand Falls, New Brunswick
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: HIVE Digital Technologies, HIVE Digital Technologies
- Operator: HIVE Digital Technologies, HIVE Digital Technologies
- Province: HIVE Digital Technologies, HIVE Digital Technologies
- City: HIVE Digital Technologies, HIVE Digital Technologies
- Record kind: HIVE Digital Technologies, HIVE Digital Technologies
- Disposition: HIVE Digital Technologies, HIVE Digital Technologies
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6621033 · CC BY 4.0
Lifecycle
Conversion plannedIn May 2026, HIVE said its Grand Falls mining campus was energized while BUZZ advanced an AI/HPC conversion; AI commissioning was not announced.
- Evidence date
- 2026-05-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- HIVE Digital Technologies Ltd.: Exhibit 99.1 - Filed by newsfilecorp.com · HIVE Digital Technologies
Capacity
ReportedThe issuer reported 70 MW of energized gross load at Grand Falls.
- Evidence date
- 2026-05-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- issuer-reported energized gross load; not measured demand or AI IT load
- Reported quantity
- 70 MW
- HIVE Digital Technologies Ltd.: Exhibit 99.1 - Filed by newsfilecorp.com · HIVE Digital Technologies
Capacity
PlannedBUZZ targeted a 50 MW AI/HPC conversion at the existing campus.
- Evidence date
- 2026-05-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Unspecified
- Basis
- conversion target; gross-versus-IT basis not stated
- Reported quantity
- 50 MW
- HIVE Digital Technologies Ltd.: Exhibit 99.1 - Filed by newsfilecorp.com · HIVE Digital Technologies
Capacity
ReportedHIVE described an owned 80 MW substation serving the campus.
- Evidence date
- 2025-11-03
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Utility supply
- Basis
- substation rating; overlaps campus power and is not additive
- Reported quantity
- 80 MW
Power
ReportedHIVE characterizes Grand Falls power as hydroelectric; this is an issuer environmental description, not proof of exclusive physical hydro delivery.
- Evidence date
- 2025-11-03
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power configuration
Ownership
HistoricalThe 2021 acquisition announcement identifies HIVE Atlantic Datacentres Ltd., formerly GPU Atlantic Inc., as the acquired facility-owning subsidiary.
- Evidence date
- 2021-04-19
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
Connectivity
Contracted not delivery verifiedHIVE contracted a carrier fibre upgrade, including multiple 100/400 Gbps wavelengths, for approximately US$3.1 million over five years; delivery was expected from Q3 2026.
- Evidence date
- 2026-05-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity service or plan
- HIVE Digital Technologies Ltd.: Exhibit 99.1 - Filed by newsfilecorp.com · HIVE Digital Technologies