CLARION Data projects

Browse this record in the Atlas

Project · Evidence reviewed 2026-10-06

TELUS / Westbank M3 AI Factory

TELUS / Westbank · Vancouver, British Columbia

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6173331 · CC BY 4.0

Location

Reported

Vancouver, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Lifecycle

Planned

TELUS describes M3 as part of a planned three-site BC AI cluster. The release’s target timetable is not confirmation of site permitting or operation.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Power

Planned

TELUS says it secured an initial 85 MW across three BC sites, with a cluster ambition above 150 MW by 2032. Neither total is assigned to this individual site.

Evidence date
Undated source
Checked
2026-10-05
Scope
Three site cluster
Evidence type
Reported
Status describes
Power supply or backup configuration

Cooling

Planned

The Vancouver developments are designed for liquid recirculation and future district heat reuse. The release does not establish installed or commissioned systems.

Evidence date
Undated source
Checked
2026-10-05
Scope
Vancouver projects
Evidence type
Reported
Status describes
Cooling system at stated scope

Hardware

Planned

Grace Blackwell and Vera Rubin platforms and more than 60,000 GPUs are a full-cluster plan. The release does not allocate a model/count to this site or establish installation.

Evidence date
Undated source
Checked
2026-10-05
Scope
Three site cluster
Evidence type
Reported
Status describes
Hardware deployment procurement or support

Ownership

Reported

The reviewed source identifies TELUS / Westbank in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship