Campus · Evidence reviewed 2026-10-06
IREN Prince George
IREN · Prince George, British Columbia
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Operator: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Province: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- City: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Record kind: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Disposition: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6113365 · CC BY 4.0
Location
ReportedPrince George, British Columbia. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Lifecycle
IREN’s May 2024 filing exhibit explicitly lists Prince George as complete and operating. The 2026 project table separately reports planned gross power; it does not refresh current usable AI IT load.
- Evidence date
- 2024-05
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Capacity
ReportedThe FY2026 filing lists 50 MW for Prince George in a table labelled total planned gross power. This is not current draw or verified usable AI IT capacity.
- Evidence date
- 2026-06-30
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Gross power
- Basis
- planned_gross_power_table
- Reported quantity
- 50 MW · not current draw or verified usable AI IT capacity
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Power
ReportedIREN says its BC operations use the BC Hydro grid, with about 98% clean/renewable electricity and certificates accounting for the remainder. This is not a dedicated 100% hydro feed.
- Evidence date
- 2026-06-30
- Checked
- 2026-10-05
- Scope
- Canadian operations
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Hardware
Procured not installedThe FY2025 SEC filing records August procurement of approximately 1,200 B300 and 1,200 GB300 accelerators for future installation at Prince George. This is procurement evidence, not a confirmed installed count.
- Evidence date
- 2025-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Hardware deployment procurement or support
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Hardware
Ordered not installedThe FY2025 SEC MD&A describes a July announcement of about 1,300 B200 and 1,100 B300 GPUs. Note 24 instead lists about 1,300 B200 and 1,200 B300 for the July purchase, with later partial termination/refinancing. The differing figures are not reconciled into an installed fleet.
- Evidence date
- 2025-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Hardware deployment procurement or support
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Power readiness
HistoricalThe May 2024 issuer table lists Prince George’s 50 MW as complete and operating. This historical campus quantity is not a current usable AI IT-load measure.
- Evidence date
- 2024-05
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Power milestone at stated scope
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR
Ownership
ReportedThe reviewed source identifies IREN in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- IREN annual report for the year ended 30 June 2025 · IREN filing on SEC EDGAR