Campus · Evidence reviewed 2026-10-06
IREN Mackenzie
IREN · Mackenzie, British Columbia
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, District of Mackenzie
- Operator: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, District of Mackenzie
- Province: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, District of Mackenzie
- City: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, District of Mackenzie
- Record kind: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, District of Mackenzie
- Disposition: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR, District of Mackenzie
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6063191 · CC BY 4.0
Location
ReportedMackenzie, British Columbia. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Lifecycle
IREN’s May 2024 filing exhibit explicitly lists Mackenzie as complete and operating. The 2026 project table separately reports planned gross power; it does not refresh current usable AI IT load.
- Evidence date
- 2024-05
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Capacity
ReportedThe FY2026 filing lists 80 MW for Mackenzie in a table labelled total planned gross power. This is not current draw or verified usable AI IT capacity.
- Evidence date
- 2026-06-30
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Gross power
- Basis
- planned_gross_power_table
- Reported quantity
- 80 MW · not current draw or verified usable AI IT capacity
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Power
ReportedIREN says its BC operations use the BC Hydro grid, with about 98% clean/renewable electricity and certificates accounting for the remainder. This is not a dedicated 100% hydro feed.
- Evidence date
- 2026-06-30
- Checked
- 2026-10-05
- Scope
- Canadian operations
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Power readiness
HistoricalIREN’s May 2024 table labels Mackenzie’s 80 MW complete and operating. This historical campus measure is not 2026 AI IT load.
- Evidence date
- 2024-05
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Power milestone at stated scope
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Commercial
FinancingThe FY2026 SEC filing reports approximately US$2.4 billion of financing agreed in August 2026 for GPU servers and related Mackenzie equipment. Funding is tied to equipment acceptance through December 2026; this is not an installed GPU count.
- Evidence date
- 2026-08
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Ownership
HistoricalThe municipality says IREN bought development land from the District in 2021. This does not identify the present subsidiary titleholder.
- Evidence date
- 2021
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie
Ownership
ReportedThe reviewed source identifies IREN in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
- District of Mackenzie partners with IREN on high speed connectivity - District of Mackenzie · District of Mackenzie