Campus · Evidence reviewed 2026-10-06

IREN Mackenzie

IREN · Mackenzie, British Columbia

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6063191 · CC BY 4.0

Location

Reported

Mackenzie, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Lifecycle

Historically operating

IREN’s May 2024 filing exhibit explicitly lists Mackenzie as complete and operating. The 2026 project table separately reports planned gross power; it does not refresh current usable AI IT load.

Evidence date
2024-05
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Capacity

Reported

The FY2026 filing lists 80 MW for Mackenzie in a table labelled total planned gross power. This is not current draw or verified usable AI IT capacity.

Evidence date
2026-06-30
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Gross power
Basis
planned_gross_power_table
Reported quantity
80 MW · not current draw or verified usable AI IT capacity

Power

Reported

IREN says its BC operations use the BC Hydro grid, with about 98% clean/renewable electricity and certificates accounting for the remainder. This is not a dedicated 100% hydro feed.

Evidence date
2026-06-30
Checked
2026-10-05
Scope
Canadian operations
Evidence type
Reported
Status describes
Power supply or backup configuration

Power readiness

Historical

IREN’s May 2024 table labels Mackenzie’s 80 MW complete and operating. This historical campus measure is not 2026 AI IT load.

Evidence date
2024-05
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Power milestone at stated scope

Commercial

Financing

The FY2026 SEC filing reports approximately US$2.4 billion of financing agreed in August 2026 for GPU servers and related Mackenzie equipment. Funding is tied to equipment acceptance through December 2026; this is not an installed GPU count.

Evidence date
2026-08
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Commercial disclosure or relationship

Ownership

Historical

The municipality says IREN bought development land from the District in 2021. This does not identify the present subsidiary titleholder.

Evidence date
2021
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship

Ownership

Reported

The reviewed source identifies IREN in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship