Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Operator: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Province: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- City: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Record kind: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
- Disposition: IREN filing on SEC EDGAR, IREN filing on SEC EDGAR
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5914778 · CC BY 4.0
Location
ReportedCanal Flats, British Columbia. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
Lifecycle
IREN’s May 2024 filing exhibit explicitly lists Canal Flats as complete and operating. The 2026 project table separately reports planned gross power; it does not refresh current usable AI IT load.
- Evidence date
- 2024-05
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
Capacity
ReportedThe FY2026 filing lists 30 MW for Canal Flats in a table labelled total planned gross power. This is not current draw or verified usable AI IT capacity.
- Evidence date
- 2026-06-30
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Gross power
- Basis
- planned_gross_power_table
- Reported quantity
- 30 MW · not current draw or verified usable AI IT capacity
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
Power
ReportedIREN says its BC operations use the BC Hydro grid, with about 98% clean/renewable electricity and certificates accounting for the remainder. This is not a dedicated 100% hydro feed.
- Evidence date
- 2026-06-30
- Checked
- 2026-10-05
- Scope
- Canadian operations
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
Power readiness
HistoricalThe May 2024 issuer table identifies the 30 MW campus as complete and operating; it does not certify 2026 usable AI IT capacity.
- Evidence date
- 2024-05
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Power milestone at stated scope
- IREN annual report for the year ended 30 June 2026 · IREN filing on SEC EDGAR
- IREN May 2024 operational update, SEC exhibit 99.1 · IREN filing on SEC EDGAR
Ownership
ReportedThe reviewed source identifies IREN in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes