CLARION Data projects

Browse this record in the Atlas

Facility · Evidence reviewed 2026-10-06

Hut 8 Kelowna

Hut 8 Canada · Kelowna, British Columbia

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5990579 · CC BY 4.0

Location

Reported

Kelowna, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Lifecycle

Operating

Hut 8 markets its Kelowna facility as operating. The managed-cloud-business sale did not itself transfer all Canadian facility ownership.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Capacity

Unclear

The operator specifies 3 MW designed facility power. Its separate cooling-supported IT-load figure of more than 1 MW is a lower-bound design statement, not current consumption.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Facility power
Basis
design

Power

Operating

Hut 8 describes BC Hydro supply and two 1,500 kW diesel generators. Its approximately 95% clean-energy statement characterizes supply accounting; generator ratings are not added to utility power.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration

Cooling

Operating

The Kelowna specification identifies two 200-ton chillers and N+1 cooling redundancy.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope

Ownership

Reported

Opti9’s September 2026 announcement says Hut 8 retained Canadian data centres while Opti9 took over the acquired managed-cloud infrastructure under multiyear colocation.

Evidence date
2026-09-03
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship

Ownership

Reported

The reviewed source identifies Hut 8 Canada in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship