DMG Christina Lake data centre

DMG Blockchain Solutions · Christina Lake, British Columbia

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5921896 · CC BY 4.0

Location

Reported

Christina Lake, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Lifecycle

Conversion proposed

DMG describes an existing mining facility being considered for AI conversion. Its September update says the proposed AI tenancy is not yet under a definitive agreement.

Evidence date
2026-09-14
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Capacity

Mixed existing and proposed

DMG confirms 75 MW utility capacity, comprising 15 MW firm and 60 MW curtailable, after contracting an additional 10 MW. A separate 150 MW firm application, 50 MW critical-IT tenant LOI and possible 60 MW critical-IT addition remain conditional. None may be summed or treated as commissioned AI IT capacity.

Evidence date
2026-09-14
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Utility supply
Basis
approved

Connectivity

Contracted

DMG says it contracted two providers for two 100 Gbps fibre paths. A possible third path and upgrades to 400 Gbps remain options; activation dates are not disclosed.

Evidence date
2026-09-14
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Connectivity infrastructure or service

Commercial

Letter of intent

The potential 50 MW critical-IT customer remains unnamed and its definitive colocation agreement is unresolved in the September update.

Evidence date
2026-09-14
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Commercial disclosure or relationship

Ownership

Reported

The reviewed source identifies DMG Blockchain Solutions in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship