Facility · Evidence reviewed 2026-10-06
DMG Christina Lake data centre
DMG Blockchain Solutions · Christina Lake, British Columbia
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Issuer press release via GlobeNewswire
- Operator: Issuer press release via GlobeNewswire
- Province: Issuer press release via GlobeNewswire
- City: Issuer press release via GlobeNewswire
- Record kind: Issuer press release via GlobeNewswire
- Disposition: Issuer press release via GlobeNewswire
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5921896 · CC BY 4.0
Location
ReportedChristina Lake, British Columbia. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- DMG Blockchain Solutions Provides Update on its Christina · Issuer press release via GlobeNewswire
Lifecycle
Conversion proposedDMG describes an existing mining facility being considered for AI conversion. Its September update says the proposed AI tenancy is not yet under a definitive agreement.
- Evidence date
- 2026-09-14
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- DMG Blockchain Solutions Provides Update on its Christina · Issuer press release via GlobeNewswire
Capacity
Mixed existing and proposedDMG confirms 75 MW utility capacity, comprising 15 MW firm and 60 MW curtailable, after contracting an additional 10 MW. A separate 150 MW firm application, 50 MW critical-IT tenant LOI and possible 60 MW critical-IT addition remain conditional. None may be summed or treated as commissioned AI IT capacity.
- Evidence date
- 2026-09-14
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility supply
- Basis
- approved
- DMG Blockchain Solutions Provides Update on its Christina · Issuer press release via GlobeNewswire
Connectivity
ContractedDMG says it contracted two providers for two 100 Gbps fibre paths. A possible third path and upgrades to 400 Gbps remain options; activation dates are not disclosed.
- Evidence date
- 2026-09-14
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
- DMG Blockchain Solutions Provides Update on its Christina · Issuer press release via GlobeNewswire
Commercial
Letter of intentThe potential 50 MW critical-IT customer remains unnamed and its definitive colocation agreement is unresolved in the September update.
- Evidence date
- 2026-09-14
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- DMG Blockchain Solutions Provides Update on its Christina · Issuer press release via GlobeNewswire
Ownership
ReportedThe reviewed source identifies DMG Blockchain Solutions in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- DMG Blockchain Solutions Provides Update on its Christina · Issuer press release via GlobeNewswire