Campus · Evidence reviewed 2026-10-06
Travers AI Data Centre Campus / Palliser Grid
Palliser Grid · Vulcan County, Alberta
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Palliser Grid
- Operator: Palliser Grid
- Province: Palliser Grid
- City: Palliser Grid
- Record kind: Palliser Grid
- Disposition: Palliser Grid
No unique reviewed city reference. Intentionally unpinned.
Location
ReportedVulcan County, Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid
Lifecycle
ProposedPalliser Grid presents Travers as a proposed phased campus. Land-use progress does not establish development-permit approval, grid approval or construction.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid
Capacity
PlanningThe sponsor’s roadmap targets 400 MW for Phase 1, 1 GW for Phase 2 and a 2 GW long-term platform. Its reported preliminary screen of up to 600 MW N-1 transmission service is not AESO approval or assured energization. These overlapping stages are not additive.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Phase
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Unspecified
- Basis
- proposed
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid
Power
PlannedThe sponsor is developing a 240 kV interconnection strategy with energy supply, storage and firming workstreams.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid
Cooling
PlannedClosed-loop and dry-cooling alternatives are being evaluated; a selected commissioned system is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid
Commercial
ReportedThe sponsor says its first funding round is closed and oversubscribed; anchor-customer and operating-design work remain in progress. No executed tenant MW is disclosed.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid
Ownership
ReportedThe reviewed source identifies Palliser Grid in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Palliser Grid | Alberta Neocloud, Power & Land · Palliser Grid