Project · Evidence reviewed 2026-10-06
Synapse Alberta One / Olds data centre
Synapse Real Estate Corp. · Olds, Alberta
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Alberta Utilities Commission, Town of Olds / Synapse project package
- Operator: Alberta Utilities Commission, Town of Olds / Synapse project package
- Province: Alberta Utilities Commission, Town of Olds / Synapse project package
- City: Alberta Utilities Commission, Town of Olds / Synapse project package
- Record kind: Alberta Utilities Commission, Town of Olds / Synapse project package
- Disposition: Alberta Utilities Commission, Town of Olds / Synapse project package
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6093347 · CC BY 4.0
Location
ReportedOlds, Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Synapse Data Center Power Plant Project - AUC · Alberta Utilities Commission
- Synapse Data Center · Town of Olds / Synapse project package
Lifecycle
Power application rejectedOn 17 August 2026 the AUC rejected Synapse’s power-plant application. The ruling concerns generation and does not itself decide whether a data centre could occupy the site.
- Evidence date
- 2026-08-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Associated power plant application
- Synapse Data Center Power Plant Project - AUC · Alberta Utilities Commission
- Synapse Data Center · Town of Olds / Synapse project package
Capacity
RejectedThe former concept paired a 1 GW data-centre proposal with 1,400 MW of gas generation and 1,800 MW of emergency diesel nameplate. These distinct, non-additive values do not represent approved or operating IT capacity.
- Evidence date
- 2026-08-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Unspecified
- Basis
- proposed
- Synapse Data Center Power Plant Project - AUC · Alberta Utilities Commission
- Synapse Data Center · Town of Olds / Synapse project package
Power
RejectedThe rejected application proposed self-generation and diesel backup without connection to the Alberta interconnected system.
- Evidence date
- 2026-08-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Synapse Data Center Power Plant Project - AUC · Alberta Utilities Commission
- Synapse Data Center · Town of Olds / Synapse project package
Cooling
ProposedThe applicant proposed closed-loop cooling for the data centre and gas plant. This is a rejected-project design statement, not installed capability.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Synapse Data Center Power Plant Project - AUC · Alberta Utilities Commission
- Synapse Data Center · Town of Olds / Synapse project package
Ownership
ReportedThe reviewed source identifies Synapse Real Estate Corp. in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Synapse Data Center Power Plant Project - AUC · Alberta Utilities Commission
- Synapse Data Center · Town of Olds / Synapse project package