HubOne AI & BTC High Density Compute Park / NRG Hub-1
HubOne · Calgary region, Alberta
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
No unique reviewed city reference. Intentionally unpinned.
Location
ReportedCalgary region, Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- NRG Hub-1 Site · HubOne
Lifecycle
ProposedHubOne markets a proposed gas-to-compute campus east of Calgary; its power-delivery timetable is not proof of commissioning.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- NRG Hub-1 Site · HubOne
Capacity
Marketed futureThe sponsor’s undated roadmap claims up to 600 MW by 2026, more than 3,000 MW by 2028 and possible scale to 7,000 MW. These are non-additive power-development ambitions, not verified IT capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Phase
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Generation
- Basis
- proposed
- NRG Hub-1 Site · HubOne
Power
PlannedThe concept combines baseload gas with renewable power imported from other generation sites. It does not establish installed equipment at Hub-1.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- NRG Hub-1 Site · HubOne
Cooling
PlannedHigh-density immersion cooling is proposed for the mining component; an installed AI cooling design is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- NRG Hub-1 Site · HubOne
Hardware
MarketedThe sponsor markets an Ultra Blackwell cluster concept, without a verified GPU model, installed count or executed order.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Hardware deployment procurement or support
- NRG Hub-1 Site · HubOne
Connectivity
PlannedA dedicated fibre ring is described as under development; live carriers and physical paths are not demonstrated.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
- NRG Hub-1 Site · HubOne
Commercial
MarketedThe sponsor offers long-duration power-purchase terms and invites contracting; no executed customer contract is established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- NRG Hub-1 Site · HubOne
Ownership
ReportedThe reviewed source identifies HubOne in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- NRG Hub-1 Site · HubOne