Equinix CL3

Equinix · Calgary, Alberta

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5913490 · CC BY 4.0

Location

Reported

Calgary, Alberta. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Lifecycle

Reported

EllisDon reports completing a CL3 building addition and hall fit-out in Calgary. This is contractor-reported work, not a newly verified whole-facility operating audit.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published identity or service listing

Power

Operating

The contractor describes electrical upgrades in three CL3 halls. Its hall-specific generators and UPS equipment do not establish whole-facility usable capacity.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration

Cooling

Installed

EllisDon describes new chillers, air-handling equipment and raised-floor cooling in the expanded CL3 halls; this does not verify the separate operator N+1 claim.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope

Ownership

Reported

The reviewed source identifies Equinix in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship