Project · Evidence reviewed 2026-10-06
Bitdeer Fox Creek
Bitdeer Technologies Group · Fox Creek, Alberta
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Bitdeer, Bitdeer
- Operator: Bitdeer, Bitdeer
- Province: Bitdeer, Bitdeer
- City: Bitdeer, Bitdeer
- Record kind: Bitdeer, Bitdeer
- Disposition: Bitdeer, Bitdeer
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5956869 · CC BY 4.0
Location
ReportedFox Creek, Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
Lifecycle
Under constructionBitdeer announced groundbreaking on 1 June 2026. Its release targeted Q2 2027 energization, whereas the project page targets Q4 2027; the schedule remains inconsistent.
- Evidence date
- 2026-06-01
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
Capacity
PlannedThe plan pairs 101 MW of gas generation with roughly 100 MW of computing capacity. Bitdeer also reports a 99 MW grid interconnection approval. These different boundaries are not additive and do not establish operating IT capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Generation
- Basis
- approved
Power
PlannedThe proposed compute load is supplied by on-site natural-gas generation, with flexibility to export power when mining is curtailed.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
Cooling
PlannedThe planned thermal system circulates fluid through dry heat exchangers and fans; Bitdeer describes negligible routine water use.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
Ownership
ReportedThe reviewed source identifies Bitdeer Technologies Group in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship