CLARION Data projects

Browse this record in the Atlas

Project · Evidence reviewed 2026-10-06

WhiteFiber / Enovum MTL-2

WhiteFiber / Enovum Data Centers · Pointe-Claire, Quebec

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6107325 · CC BY 4.0

Lifecycle

Planned retrofit

The August 2026 filing describes a Pointe-Claire retrofit, with initial construction expected in Q3 2026; actual start is not established.

Evidence date
2026-08-12
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle

Capacity

Planned

The filing describes MTL-2 as 5 MW gross.

Evidence date
2026-08-12
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Reported capacity
Quantity type
Facility power
Basis
gross facility rating; not equivalent to IT load or measured demand
Reported quantity
5 MW