Facility · Evidence reviewed 2026-10-06
Argo Baie-Comeau data centre
Argo Blockchain · Baie-Comeau, Quebec
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Argo Blockchain, Argo Blockchain
- Operator: Argo Blockchain, Argo Blockchain
- Province: Argo Blockchain, Argo Blockchain
- City: Argo Blockchain, Argo Blockchain
- Record kind: Argo Blockchain, Argo Blockchain
- Disposition: Argo Blockchain, Argo Blockchain
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5889745 · CC BY 4.0
Lifecycle
Argo’s April 2026 filing for fiscal 2025 states that it owns and operates a data centre in Baie-Comeau.
- Evidence date
- 2026-04-30
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- ARGO BLOCKCHAIN PLC_December 31, 2025 · Argo Blockchain
Capacity
ReportedArgo reports 15 MW of power capacity at Baie-Comeau.
- Evidence date
- 2026-04-30
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- issuer-reported site power; not measured demand or AI IT capacity
- Reported quantity
- 15 MW
- ARGO BLOCKCHAIN PLC_December 31, 2025 · Argo Blockchain
Capacity
Conditional planExpansion from 15 MW to 23 MW depends on a municipal power contract, according to Argo.
- Evidence date
- 2026-04-30
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- conditional total expansion ceiling; not an additional 23 MW
- Reported quantity
- 23 MW
- ARGO BLOCKCHAIN PLC_December 31, 2025 · Argo Blockchain
Power
ReportedArgo characterizes the site’s power capacity as 99% renewable and supplied from the nearby hydroelectric dam.
- Evidence date
- 2026-04-30
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power configuration
- ARGO BLOCKCHAIN PLC_December 31, 2025 · Argo Blockchain
Commercial
Nonbinding historicalIn November 2024 Argo disclosed a nonbinding HPC-expansion letter of intent with BE Global Development, subject to further conditions.
- Evidence date
- 2024-11-07
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure
- a4207l · Argo Blockchain