{"city":"Armour Township","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-on-169-1","attribute":"capacity","capacity_basis":"historical proposal; commissioning not established","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":2,"phase":"initial","qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_a-ona-008"],"status":"historical_proposal","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The developer described an initial 2 MW modular deployment for its Armour Township proposal. This was a design plan, not operating IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-on-169-2","attribute":"capacity","capacity_basis":"historical master-plan target","capacity_type":"campus_total","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":10,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-ontario_a-ona-008"],"status":"historical_proposal","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The historical master plan contemplated expansion to 10 MW."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-on-169-3","attribute":"power","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_a-ona-008"],"status":"historical_proposal","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The proposed electrical design used a customer-owned 44 kV substation and 2 MVA transformer; energization is not established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-on-169-4","attribute":"cooling","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_a-ona-008"],"status":"historical_proposal","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The proposal described direct-to-chip liquid loops using ambient-air heat rejection. This does not establish installed equipment."}],"disposition":"historical","field_provenance":{"city":["pub-src-ontario_a-ona-008"],"disposition":["pub-src-ontario_a-ona-008"],"name":["pub-src-ontario_a-ona-008"],"operator":["pub-src-ontario_a-ona-008"],"province":["pub-src-ontario_a-ona-008"],"record_kind":["pub-src-ontario_a-ona-008"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Almaguin Data Armour proposal (historical)","operator":"Almaguin Data","placement":null,"province":"Ontario","record_id":"on-169","record_kind":"historical"}
