{"city":"Undisclosed","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-110-application_status","attribute":"application_status","capacity_basis":null,"capacity_type":null,"category":"power_readiness","claim_kind":"reported","evidence_date":"2026-09-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"connection_application","source_ids":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"],"status":"on_hold","status_subject":"utility_connection_application_status","unit":null,"value":"The IESO table lists the Ontario–Milton Data Centre DC1 connection application as On-Hold. This is an assessment/application status, not a facility-operation or energization finding."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-110-application_load","attribute":"application_load","capacity_basis":"proposed connection application load","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":"2026-09-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":720,"phase":null,"qualifier":null,"scope":"connection_application","source_ids":["pub-src-ontario_b-ieso-data"],"status":"proposed","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The application requests 720 MW of load with proposed in-service timing 2032-Q4. The value is proposed grid load, not operating IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-110-location_zone","attribute":"location_zone","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":"2026-09-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"connection_application","source_ids":["pub-src-ontario_b-ieso-data"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"The registry places the application in Ontario’s Southwest transmission zone; the row does not establish a parcel or municipality."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-110-applicant","attribute":"applicant","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":"2026-09-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"connection_application","source_ids":["pub-src-ontario_b-ieso-data"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"Logistics Land Investment, LLC is the connection applicant; the row does not establish land ownership or a commissioned facility operator."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"],"disposition":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"],"name":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"],"operator":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"],"province":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"],"record_kind":["pub-src-ontario_b-ieso-data","pub-src-ontario_b-ona-258"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Source reuse notice: Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)","name":"Ontario–Milton Data Centre DC1","operator":"Logistics Land Investment, LLC","placement":null,"province":"Ontario","record_id":"on-110","record_kind":"project"}