{"city":"Richmond Hill","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-location","attribute":"location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-106"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"UDCS locates DC4 at Barker Business Park in Richmond Hill, Ontario; no street number is assigned."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-project_status","attribute":"project_status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-210"],"status":"under_construction","status_subject":"facility_or_project_lifecycle","unit":null,"value":"UDCS’s undated available-sites page describes DC4 as under construction."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-critical_design","attribute":"critical_design","capacity_basis":"operator-advertised design/planned critical IT capacity","capacity_type":"IT_design_capacity","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":36,"phase":null,"qualifier":"up_to","scope":"facility","source_ids":["pub-src-ontario_b-onb-107","pub-src-ontario_b-onb-106"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"UDCS advertises up to 36 MW of critical IT/design power for DC4, not commissioned IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-secured_power_claim","attribute":"secured_power_claim","capacity_basis":"operator-reported total power secured","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":40,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-210"],"status":"reported","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"UDCS says 40 MW of total power is secured for DC4. This is not an independently verified utility commitment or usable-IT figure."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-cooling_options","attribute":"cooling_options","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-210"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"UDCS advertises free-air, liquid-cooled and hybrid design options; the final commissioned cooling system is not established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-developer","attribute":"developer","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-106"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"Urbacon Data Centre Solutions markets and develops the project; the legal titleholding entity is not named."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-readiness","attribute":"readiness","capacity_basis":null,"capacity_type":null,"category":"power_readiness","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-107","pub-src-ontario_b-onb-210"],"status":"reported","status_subject":"power_milestone_at_stated_scope","unit":null,"value":"UDCS reports an approved permit, completed civil works and power energized at the DC4 site; no usable-IT acceptance document is supplied."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-marketing","attribute":"marketing","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-106"],"status":"reported","status_subject":"marketed_service","unit":null,"value":"The operator markets DC4 for lease; no specific executed customer lease or vacant MW is disclosed."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-033-connectivity","attribute":"connectivity","capacity_basis":null,"capacity_type":null,"category":"connectivity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-107","pub-src-ontario_b-onb-210"],"status":"reported","status_subject":"connectivity_at_stated_scope","unit":null,"value":"UDCS reports fibre at site and possible future inter-facility connections, without proof that all contemplated routes are commissioned."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-ontario_b-onb-106"],"disposition":["pub-src-ontario_b-onb-106"],"name":["pub-src-ontario_b-onb-106"],"operator":["pub-src-ontario_b-onb-106"],"province":["pub-src-ontario_b-onb-106"],"record_kind":["pub-src-ontario_b-onb-106"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Urbacon Toronto DC4","operator":"Urbacon Data Centre Solutions","placement":{"accessed_date":"2026-10-05","city":"Richmond Hill","gazetteer_id":"6122091","gazetteer_modified_date":"2026-08-02","latitude":43.8711,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-79.4373,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6122091/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Ontario","record_id":"on-033","record_kind":"project"}
