{"city":"Grand Falls","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-1","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-05-08","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-01f30c5892ef"],"status":"conversion_planned","status_subject":"facility_or_project_lifecycle","unit":null,"value":"In May 2026, HIVE said its Grand Falls mining campus was energized while BUZZ advanced an AI/HPC conversion; AI commissioning was not announced."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-2","attribute":"capacity","capacity_basis":"issuer-reported energized gross load; not measured demand or AI IT load","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-05-08","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":70,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-01f30c5892ef"],"status":"reported","status_subject":"reported_capacity","unit":"MW","value":"The issuer reported 70 MW of energized gross load at Grand Falls."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-3","attribute":"capacity","capacity_basis":"conversion target; gross-versus-IT basis not stated","capacity_type":"unspecified","category":"capacity","claim_kind":"reported","evidence_date":"2026-05-08","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":50,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-01f30c5892ef"],"status":"planned","status_subject":"reported_capacity","unit":"MW","value":"BUZZ targeted a 50 MW AI/HPC conversion at the existing campus."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-4","attribute":"capacity","capacity_basis":"substation rating; overlaps campus power and is not additive","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":"2025-11-03","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":80,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-4a6134f80478"],"status":"reported","status_subject":"reported_capacity","unit":"MW","value":"HIVE described an owned 80 MW substation serving the campus."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-5","attribute":"power","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2025-11-03","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-4a6134f80478"],"status":"reported","status_subject":"power_configuration","unit":null,"value":"HIVE characterizes Grand Falls power as hydroelectric; this is an issuer environmental description, not proof of exclusive physical hydro delivery."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-6","attribute":"ownership","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":"2021-04-19","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-ccc67b17a159"],"status":"historical","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The 2021 acquisition announcement identifies HIVE Atlantic Datacentres Ltd., formerly GPU Atlantic Inc., as the acquired facility-owning subsidiary."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-hive-grandfalls-7","attribute":"connectivity","capacity_basis":null,"capacity_type":null,"category":"connectivity","claim_kind":"reported","evidence_date":"2026-05-08","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-01f30c5892ef"],"status":"contracted_not_delivery_verified","status_subject":"connectivity_service_or_plan","unit":null,"value":"HIVE contracted a carrier fibre upgrade, including multiple 100/400 Gbps wavelengths, for approximately US$3.1 million over five years; delivery was expected from Q3 2026."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-quebec-east-01f30c5892ef","pub-src-quebec-east-ccc67b17a159"],"disposition":["pub-src-quebec-east-01f30c5892ef","pub-src-quebec-east-ccc67b17a159"],"name":["pub-src-quebec-east-01f30c5892ef","pub-src-quebec-east-ccc67b17a159"],"operator":["pub-src-quebec-east-01f30c5892ef","pub-src-quebec-east-ccc67b17a159"],"province":["pub-src-quebec-east-01f30c5892ef","pub-src-quebec-east-ccc67b17a159"],"record_kind":["pub-src-quebec-east-01f30c5892ef","pub-src-quebec-east-ccc67b17a159"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"HIVE Grand Falls campus and BUZZ conversion","operator":"HIVE Digital Technologies / BUZZ HPC","placement":{"accessed_date":"2026-10-05","city":"Grand Falls","gazetteer_id":"6621033","gazetteer_modified_date":"2025-07-02","latitude":47.0461,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-67.7418,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6621033/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"New Brunswick","record_id":"nb-hive-grandfalls","record_kind":"campus"}
