{"city":"Winnipeg","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-mb-greatwestlife-1","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2012-06","evidence_date_precision":"month","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_a-rem-s051"],"status":"historical_completed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Wescan identifies Great-West Life’s Winnipeg data centre in St. Boniface Industrial Park and gives June 2012 as completion. These are historical project roles and dates, not present operation or title."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-mb-greatwestlife-2","attribute":"power","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2012-06","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_a-rem-s051"],"status":"historical","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The electrical contractor lists two 1,500 kVA transformers, two 1,500 kVA generator sets and two 750 kVA UPS units. kVA is retained without conversion to MW or addition as usable IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_a-mb-greatwestlife-3","attribute":"commercial","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2012-06","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_a-rem-s051"],"status":"historical","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"Wescan identifies itself for electrical work and EllisDon as contractor on the historical project."}],"disposition":"historical","field_provenance":{"city":["pub-src-ontario_a-rem-s051"],"disposition":["pub-src-ontario_a-rem-s051"],"name":["pub-src-ontario_a-rem-s051"],"operator":["pub-src-ontario_a-rem-s051"],"province":["pub-src-ontario_a-rem-s051"],"record_kind":["pub-src-ontario_a-rem-s051"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Great-West Life / Canada Life data centre","operator":"Great-West Life (historical owner/client)","placement":{"accessed_date":"2026-10-05","city":"Winnipeg","gazetteer_id":"6183235","gazetteer_modified_date":"2026-04-13","latitude":49.8844,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-97.147,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6183235/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Manitoba","record_id":"mb-greatwestlife","record_kind":"historical"}
