{"city":"Vancouver","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-telus-m3-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-232b4019393f"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Vancouver, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-telus-m3-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-232b4019393f"],"status":"planned","status_subject":"facility_or_project_lifecycle","unit":null,"value":"TELUS describes M3 as part of a planned three-site BC AI cluster. The release’s target timetable is not confirmation of site permitting or operation."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-telus-m3-review-3","attribute":"cluster_power_context","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"three_site_cluster","source_ids":["pub-src-west-full-232b4019393f"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"TELUS says it secured an initial 85 MW across three BC sites, with a cluster ambition above 150 MW by 2032. Neither total is assigned to this individual site."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-telus-m3-review-4","attribute":"planned_cooling","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"vancouver_projects","source_ids":["pub-src-west-full-232b4019393f"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The Vancouver developments are designed for liquid recirculation and future district heat reuse. The release does not establish installed or commissioned systems."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-telus-m3-review-5","attribute":"cluster_hardware_plan","capacity_basis":null,"capacity_type":null,"category":"hardware","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"three_site_cluster","source_ids":["pub-src-west-full-232b4019393f"],"status":"planned","status_subject":"hardware_deployment_procurement_or_support","unit":null,"value":"Grace Blackwell and Vera Rubin platforms and more than 60,000 GPUs are a full-cluster plan. The release does not allocate a model/count to this site or establish installation."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-telus-m3-review-6","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-232b4019393f"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies TELUS / Westbank in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-232b4019393f"],"disposition":["pub-src-west-full-232b4019393f"],"name":["pub-src-west-full-232b4019393f"],"operator":["pub-src-west-full-232b4019393f"],"province":["pub-src-west-full-232b4019393f"],"record_kind":["pub-src-west-full-232b4019393f"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"TELUS / Westbank M3 AI Factory","operator":"TELUS / Westbank","placement":{"accessed_date":"2026-10-05","city":"Vancouver","gazetteer_id":"6173331","gazetteer_modified_date":"2025-08-04","latitude":49.2497,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-123.1193,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6173331/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-telus-m3","record_kind":"project"}
