{"city":"Vancouver","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Vancouver, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"mixed_operating_and_development","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Spencer markets operating colocation and meet-me-room services alongside powered-shell expansion. A shell being available is not evidence of commissioned tenant IT."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-3","attribute":"power_capacity","capacity_basis":"design","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"phased_design","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The technical sheet separates 8 MW total power from 4.7 MW IT across two 2.35 MW halls, with the second hall still a later phase. The first hall’s 2025 shell milestone is not proof of tenant commissioning. These quantities are non-additive design scopes."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-4","attribute":"power_shell_specification","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"Phase 1","qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"design","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The powered-shell design uses BC Hydro conductors and diesel standby generation; tenant UPS is separate. Generator nameplate is not usable IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-5","attribute":"cooling_specification","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"Powered shell/Colo5","qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"design","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The first-phase design identifies air-cooled magnetic-bearing chillers; Colo5 separately describes raised-floor cold-aisle distribution."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-6","attribute":"entrance_diversity","capacity_basis":null,"capacity_type":null,"category":"connectivity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"operating","status_subject":"connectivity_infrastructure_or_service","unit":null,"value":"The operator describes new east/west fibre entrances and meet-me-room links to the Harbour Centre complex."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-7","attribute":"marketed_availability","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"marketed","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"The first shell is offered for concurrent tenant fit-out. Colo5’s page advertises a 100 kW first phase; its old Q1 2025 second-phase target is not completion evidence."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-spencer-review-8","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Spencer Building Carrier Hotel in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"disposition":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"name":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"operator":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"province":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"],"record_kind":["pub-src-west-full-0da513c9bce7","pub-src-west-full-83f64f18bc9a","pub-src-west-full-fda3b3a66e53"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Spencer Building Carrier Hotel / Colo5 / MMR5","operator":"Spencer Building Carrier Hotel","placement":{"accessed_date":"2026-10-05","city":"Vancouver","gazetteer_id":"6173331","gazetteer_modified_date":"2025-08-04","latitude":49.2497,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-123.1193,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6173331/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-spencer","record_kind":"campus"}
