{"city":"Terrace","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Terrace, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"early_development","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Skeena describes an early-stage campus development with feasibility, land, power, design and finance work still underway."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-3","attribute":"power_capacity","capacity_basis":"ultimate_buildout","capacity_type":"campus_total","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":300,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"campus","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The long-term ambition is up to 300 MW in phases. It is not utility-approved capacity or operating load."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-4","attribute":"hybrid_power_proposal","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"Options under study include gas generation, later BC Hydro access, geothermal and battery storage. The final mix depends on studies, permissions and agreements."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-5","attribute":"planned_cooling","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"Shared closed-loop cooling is part of the campus concept, without evidence of an installed plant."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-6","attribute":"marketed_design_options","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"marketed","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"The developer markets independently owned private centres starting at 5 MW, with shared infrastructure. No signed tenant or committed vacancy figure is established."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-skeena-terrace-review-7","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Skeena Data Centers in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"disposition":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"name":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"operator":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"province":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"],"record_kind":["pub-src-west-full-7f063769cdfe","pub-src-west-full-f9faabdccb91"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Skeena Data Centers campus","operator":"Skeena Data Centers","placement":{"accessed_date":"2026-10-05","city":"Terrace","gazetteer_id":"6162949","gazetteer_modified_date":"2026-08-31","latitude":54.5163,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-128.6035,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6162949/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-skeena-terrace","record_kind":"campus"}
