{"city":"Burnaby","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Burnaby, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2025-09","evidence_date_precision":"month","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"operating","status_subject":"facility_or_project_lifecycle","unit":null,"value":"SFU and the Digital Research Alliance report Fir fully operational at the Cedar Supercomputing Centre, replacing the Cedar computer. The facility and successive machines are not separate buildings."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-3","attribute":"electrical_equipment_ratings","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2017","evidence_date_precision":"year","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"historical_design","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The 2017 engineering profile lists MVA-rated electrical equipment and a 550 kVA UPS for high-availability computing. MVA/kVA are not converted to MW without a power factor."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-4","attribute":"renewable_claim","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"operating","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"SFU describes the centre as clean-energy powered. A dedicated generation source and actual site draw are not disclosed."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-5","attribute":"installed_cooling","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"installed","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"Fir uses direct-to-chip liquid cooling. A separate contractor profile describes the 2017 chiller/free-cooling works; the historical equipment must not be assumed to describe every part of the replacement system."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-6","attribute":"gpu_deployment","capacity_basis":null,"capacity_type":null,"category":"hardware","claim_kind":"reported","evidence_date":"2025-09","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"Fir","qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"installed","status_subject":"hardware_deployment_procurement_or_support","unit":null,"value":"The Fir disclosure identifies 640 NVIDIA H100 SXM5 80GB GPUs. This belongs to the named research system at SFU."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-sfu-cedar-centre-review-7","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Simon Fraser University in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"disposition":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"name":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"operator":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"province":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"],"record_kind":["pub-src-west-full-3d6853ef4f29","pub-src-west-full-5f0428caddad","pub-src-west-full-68815a39220f","pub-src-west-full-3f3b8a86250a","pub-src-west-full-d4d6f7d6d65a"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Cedar Supercomputing Centre / Water Tower data centre","operator":"Simon Fraser University","placement":{"accessed_date":"2026-10-05","city":"Burnaby","gazetteer_id":"5911606","gazetteer_modified_date":"2025-08-04","latitude":49.2664,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-122.9526,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/5911606/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-sfu-cedar-centre","record_kind":"facility"}
