{"city":"Prince George","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Prince George, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2024-05","evidence_date_precision":"month","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"historically_operating","status_subject":"facility_or_project_lifecycle","unit":null,"value":"IREN’s May 2024 filing exhibit explicitly lists Prince George as complete and operating. The 2026 project table separately reports planned gross power; it does not refresh current usable AI IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-3","attribute":"power_capacity","capacity_basis":"planned_gross_power_table","capacity_type":"gross_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-06-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":50,"phase":null,"qualifier":"not current draw or verified usable AI IT capacity","scope":"campus","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"reported","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The FY2026 filing lists 50 MW for Prince George in a table labelled total planned gross power. This is not current draw or verified usable AI IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-4","attribute":"contractual_renewables","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2026-06-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"canadian_operations","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"reported","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"IREN says its BC operations use the BC Hydro grid, with about 98% clean/renewable electricity and certificates accounting for the remainder. This is not a dedicated 100% hydro feed."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-5","attribute":"gpu_order","capacity_basis":null,"capacity_type":null,"category":"hardware","claim_kind":"reported","evidence_date":"2025-08","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"procured_not_installed","status_subject":"hardware_deployment_procurement_or_support","unit":null,"value":"The FY2025 SEC filing records August procurement of approximately 1,200 B300 and 1,200 GB300 accelerators for future installation at Prince George. This is procurement evidence, not a confirmed installed count."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-6","attribute":"historical_orders","capacity_basis":null,"capacity_type":null,"category":"hardware","claim_kind":"reported","evidence_date":"2025-08","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"ordered_not_installed","status_subject":"hardware_deployment_procurement_or_support","unit":null,"value":"The FY2025 SEC MD&A describes a July announcement of about 1,300 B200 and 1,100 B300 GPUs. Note 24 instead lists about 1,300 B200 and 1,200 B300 for the July purchase, with later partial termination/refinancing. The differing figures are not reconciled into an installed fleet."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-7","attribute":"energized","capacity_basis":null,"capacity_type":null,"category":"power_readiness","claim_kind":"reported","evidence_date":"2024-05","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"historical","status_subject":"power_milestone_at_stated_scope","unit":null,"value":"The May 2024 issuer table lists Prince George’s 50 MW as complete and operating. This historical campus quantity is not a current usable AI IT-load measure."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-prince-george-review-8","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies IREN in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"disposition":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"name":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"operator":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"province":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"],"record_kind":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-ae1b30ffcdc1"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"IREN Prince George","operator":"IREN","placement":{"accessed_date":"2026-10-05","city":"Prince George","gazetteer_id":"6113365","gazetteer_modified_date":"2025-08-04","latitude":53.9166,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-122.753,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6113365/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-iren-prince-george","record_kind":"campus"}
