{"city":"Mackenzie","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Mackenzie, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2024-05","evidence_date_precision":"month","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"historically_operating","status_subject":"facility_or_project_lifecycle","unit":null,"value":"IREN’s May 2024 filing exhibit explicitly lists Mackenzie as complete and operating. The 2026 project table separately reports planned gross power; it does not refresh current usable AI IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-3","attribute":"power_capacity","capacity_basis":"planned_gross_power_table","capacity_type":"gross_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-06-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":80,"phase":null,"qualifier":"not current draw or verified usable AI IT capacity","scope":"campus","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"reported","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The FY2026 filing lists 80 MW for Mackenzie in a table labelled total planned gross power. This is not current draw or verified usable AI IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-4","attribute":"contractual_renewables","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2026-06-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"canadian_operations","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"reported","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"IREN says its BC operations use the BC Hydro grid, with about 98% clean/renewable electricity and certificates accounting for the remainder. This is not a dedicated 100% hydro feed."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-5","attribute":"energized","capacity_basis":null,"capacity_type":null,"category":"power_readiness","claim_kind":"reported","evidence_date":"2024-05","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"historical","status_subject":"power_milestone_at_stated_scope","unit":null,"value":"IREN’s May 2024 table labels Mackenzie’s 80 MW complete and operating. This historical campus measure is not 2026 AI IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-6","attribute":"equipment_financing","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2026-08","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"financing","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"The FY2026 SEC filing reports approximately US$2.4 billion of financing agreed in August 2026 for GPU servers and related Mackenzie equipment. Funding is tied to equipment acceptance through December 2026; this is not an installed GPU count."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-7","attribute":"land_acquisition","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":"2021","evidence_date_precision":"year","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"historical","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The municipality says IREN bought development land from the District in 2021. This does not identify the present subsidiary titleholder."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-iren-mackenzie-review-8","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies IREN in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"disposition":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"name":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"operator":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"province":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"],"record_kind":["pub-src-west-full-775a39b47b03","pub-src-west-full-c710c406f2db","pub-src-west-full-776cc5dff678"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"IREN Mackenzie","operator":"IREN","placement":{"accessed_date":"2026-10-05","city":"Mackenzie","gazetteer_id":"6063191","gazetteer_modified_date":"2019-08-08","latitude":55.3364,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-123.0937,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6063191/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-iren-mackenzie","record_kind":"campus"}
