{"city":"Christina Lake","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-bc-dmg-christina-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-83f5bb8877a6"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Christina Lake, British Columbia. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-dmg-christina-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-09-14","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-83f5bb8877a6"],"status":"conversion_proposed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"DMG describes an existing mining facility being considered for AI conversion. Its September update says the proposed AI tenancy is not yet under a definitive agreement."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-dmg-christina-review-3","attribute":"power_capacity","capacity_basis":"approved","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":"2026-09-14","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-83f5bb8877a6"],"status":"mixed_existing_and_proposed","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"DMG confirms 75 MW utility capacity, comprising 15 MW firm and 60 MW curtailable, after contracting an additional 10 MW. A separate 150 MW firm application, 50 MW critical-IT tenant LOI and possible 60 MW critical-IT addition remain conditional. None may be summed or treated as commissioned AI IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-dmg-christina-review-4","attribute":"contracted_physical_routes","capacity_basis":null,"capacity_type":null,"category":"connectivity","claim_kind":"reported","evidence_date":"2026-09-14","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-83f5bb8877a6"],"status":"contracted","status_subject":"connectivity_infrastructure_or_service","unit":null,"value":"DMG says it contracted two providers for two 100 Gbps fibre paths. A possible third path and upgrades to 400 Gbps remain options; activation dates are not disclosed."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-dmg-christina-review-5","attribute":"tenant_contract_status","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2026-09-14","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-83f5bb8877a6"],"status":"letter_of_intent","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"The potential 50 MW critical-IT customer remains unnamed and its definitive colocation agreement is unresolved in the September update."},{"accessed_date":"2026-10-05","assertion_id":"pub-bc-dmg-christina-review-6","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-83f5bb8877a6"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies DMG Blockchain Solutions in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-west-full-83f5bb8877a6"],"disposition":["pub-src-west-full-83f5bb8877a6"],"name":["pub-src-west-full-83f5bb8877a6"],"operator":["pub-src-west-full-83f5bb8877a6"],"province":["pub-src-west-full-83f5bb8877a6"],"record_kind":["pub-src-west-full-83f5bb8877a6"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"DMG Christina Lake data centre","operator":"DMG Blockchain Solutions","placement":{"accessed_date":"2026-10-05","city":"Christina Lake","gazetteer_id":"5921896","gazetteer_modified_date":"2025-08-26","latitude":49.0397,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-118.2085,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/5921896/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"British Columbia","record_id":"bc-dmg-christina","record_kind":"facility"}
