{"city":"Vulcan County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-528c966cc66f"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Vulcan County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-528c966cc66f"],"status":"proposed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Palliser Grid presents Travers as a proposed phased campus. Land-use progress does not establish development-permit approval, grid approval or construction."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-3","attribute":"capacity","capacity_basis":"proposed","capacity_type":"unspecified","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"phase","source_ids":["pub-src-west-full-528c966cc66f"],"status":"planning","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The sponsor’s roadmap targets 400 MW for Phase 1, 1 GW for Phase 2 and a 2 GW long-term platform. Its reported preliminary screen of up to 600 MW N-1 transmission service is not AESO approval or assured energization. These overlapping stages are not additive."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-4","attribute":"grid_power_strategy","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-528c966cc66f"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The sponsor is developing a 240 kV interconnection strategy with energy supply, storage and firming workstreams."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-5","attribute":"planned_options","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-528c966cc66f"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"Closed-loop and dry-cooling alternatives are being evaluated; a selected commissioned system is not established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-6","attribute":"funding_vs_tenancy","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-528c966cc66f"],"status":"reported","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"The sponsor says its first funding round is closed and oversubscribed; anchor-customer and operating-design work remain in progress. No executed tenant MW is disclosed."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-travers-review-7","attribute":"developer","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-528c966cc66f"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Palliser Grid in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-528c966cc66f"],"disposition":["pub-src-west-full-528c966cc66f"],"name":["pub-src-west-full-528c966cc66f"],"operator":["pub-src-west-full-528c966cc66f"],"province":["pub-src-west-full-528c966cc66f"],"record_kind":["pub-src-west-full-528c966cc66f"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Travers AI Data Centre Campus / Palliser Grid","operator":"Palliser Grid","placement":null,"province":"Alberta","record_id":"ab-travers","record_kind":"campus"}