{"city":"Olds","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-synapse-olds-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Olds, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-synapse-olds-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-08-17","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"status":"power_application_rejected","status_subject":"associated_power_plant_application","unit":null,"value":"On 17 August 2026 the AUC rejected Synapse’s power-plant application. The ruling concerns generation and does not itself decide whether a data centre could occupy the site."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-synapse-olds-review-3","attribute":"capacity","capacity_basis":"proposed","capacity_type":"unspecified","category":"capacity","claim_kind":"reported","evidence_date":"2026-08-17","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"status":"rejected","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The former concept paired a 1 GW data-centre proposal with 1,400 MW of gas generation and 1,800 MW of emergency diesel nameplate. These distinct, non-additive values do not represent approved or operating IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-synapse-olds-review-4","attribute":"rejected_off_grid_plan","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2026-08-17","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"status":"rejected","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The rejected application proposed self-generation and diesel backup without connection to the Alberta interconnected system."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-synapse-olds-review-5","attribute":"planned_system","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"status":"proposed","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The applicant proposed closed-loop cooling for the data centre and gas plant. This is a rejected-project design statement, not installed capability."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-synapse-olds-review-6","attribute":"applicant","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Synapse Real Estate Corp. in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"disposition":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"name":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"operator":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"province":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"],"record_kind":["pub-src-west-full-06210c792b67","pub-src-west-full-afc2dc947964"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Synapse Alberta One / Olds data centre","operator":"Synapse Real Estate Corp.","placement":{"accessed_date":"2026-10-05","city":"Olds","gazetteer_id":"6093347","gazetteer_modified_date":"2026-08-31","latitude":51.7834,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-114.102,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6093347/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Alberta","record_id":"ab-synapse-olds","record_kind":"project"}
