{"city":"Sturgeon County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Sturgeon County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-08","evidence_date_precision":"month","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"under_construction","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Meta announced groundbreaking in July 2026. The county’s August update distinguishes site preparation from remaining building and safety permits."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-3","attribute":"capacity","capacity_basis":"proposed","capacity_type":"campus_total","category":"capacity","claim_kind":"reported","evidence_date":"2026-07","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":1000,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"Meta markets a 1 GW AI-focused data centre. The announcement does not define this as net server IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-4","attribute":"capacity","capacity_basis":"approved","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":"2026-08","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":970,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"approved","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The county reports a 970 MW grid-connection approval. This is a connection quantity, not commissioned IT demand."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-5","attribute":"capacity","capacity_basis":"contracted","capacity_type":"generation","category":"capacity","claim_kind":"reported","evidence_date":"2026-07-02","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":932,"phase":"Greenlight initial plant","qualifier":null,"scope":"associated_power_plant","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"Greenlight’s dedicated supply project is a separate 932 MW gas-fired generating plant targeting the second half of 2030; it is not additional data-centre IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-6","attribute":"hybrid_supply_and_matching","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The supply plan includes dedicated gas generation and grid arrangements. Meta’s clean/renewable matching commitment is contractual accounting, not evidence that all physical electricity is gas-free."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-7","attribute":"planned_system","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":"2026-07","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"Meta plans recirculating liquid cooling with dry heat rejection and no routine water consumption by the cooling system; commissioning has not been established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-8","attribute":"capacity","capacity_basis":"contracted","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":"2026-07-08","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":250,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"contracted","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"Capital Power announced a greater-than-ten-year agreement for 250 MW of capacity and energy supporting Meta’s site, with a target start in the second half of 2028. It is fleet-backed supply, not another site-capacity increment."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-9","attribute":"generation_suppliers","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2026-07-02","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"associated_power_plant","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"contracted","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"Greenlight’s announcement names Siemens equipment and an Aecon/Técnicas Reunidas construction arrangement for the associated power plant."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-meta-sturgeon-review-10","attribute":"developer_operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Meta in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"disposition":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"name":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"operator":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"province":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"],"record_kind":["pub-src-west-full-8cf493997fd0","pub-src-west-full-bf7b4f7ba66a","pub-src-west-full-c88c8005b144","pub-src-west-full-7a7f7f3ddd32"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Meta Sturgeon Data Centre / GLDC","operator":"Meta","placement":null,"province":"Alberta","record_id":"ab-meta-sturgeon","record_kind":"campus"}