{"city":"Drumheller","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-hut8-drumheller-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Drumheller, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-hut8-drumheller-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-04","evidence_date_precision":"month","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"status":"operating","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Issuer disclosures report re-energization of Drumheller in 2026 and completion of an additional miner deployment in April. These supersede the March 2024 closure as the latest operating evidence."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-hut8-drumheller-review-3","attribute":"non_GPU_compute_hardware","capacity_basis":null,"capacity_type":null,"category":"hardware","claim_kind":"reported","evidence_date":"2026-04","evidence_date_precision":"month","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"status":"installed","status_subject":"hardware_deployment_procurement_or_support","unit":null,"value":"American Bitcoin reports energizing approximately 11,298 additional Bitmain S21 XP ASIC miners. These are bitcoin-mining ASICs, not GPUs."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-hut8-drumheller-review-4","attribute":"physical_supply","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2024-03-06","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"status":"historical","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The 2024 closure release describes grid prices and supply problems at Drumheller. That is historical grid-connection evidence, not a current power-quality assessment."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-hut8-drumheller-review-5","attribute":"operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Hut 8 / American Bitcoin in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"disposition":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"name":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"operator":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"province":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"],"record_kind":["pub-src-west-full-db7341e2de99","pub-src-west-full-4c2cdda96975","pub-src-west-full-883d03fe39fa"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Hut 8 Drumheller / American Bitcoin compute site","operator":"Hut 8 / American Bitcoin","placement":{"accessed_date":"2026-10-05","city":"Drumheller","gazetteer_id":"5942798","gazetteer_modified_date":"2025-10-22","latitude":51.4617,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-112.7101,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/5942798/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Alberta","record_id":"ab-hut8-drumheller","record_kind":"facility"}
