{"city":"Rocky View County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Rocky View County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"development_marketed","status_subject":"published_identity_or_service_listing","unit":null,"value":"The reviewed material describes CAL-3’s development and launch marketing; it does not establish actual energized customer IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-3","attribute":"capacity","capacity_basis":"design","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"Phase 1 / six halls","qualifier":"Separate source-reported quantities are not additive.","scope":"phase","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"design","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The datasheet distinguishes 90 MW total facility power from 70 MW critical power within that total. They are non-additive design specifications, not measured consumption."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-4","attribute":"utility_and_backup_design","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The specification describes multiple utility feeds, UPS support and backup generation. The web page identifies diesel backup; equipment topology is not a measured availability guarantee."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-5","attribute":"planned_system","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"eStruxture describes a recirculating water-based design with air and direct-to-chip options; availability depends on deployment density."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-6","attribute":"planned_connectivity","capacity_basis":null,"capacity_type":null,"category":"connectivity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"planned","status_subject":"connectivity_infrastructure_or_service","unit":null,"value":"The operator describes diverse entrances and two meet-me rooms as part of the facility design. Independent route-level commissioning is not established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-7","attribute":"contracted_tenant","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2026-05-14","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"contracted","status_subject":"commercial_disclosure_or_relationship","unit":null,"value":"On 14 May 2026 eStruxture announced CoreWeave as anchor for part of CAL-3 Phase 1. It does not disclose contracted MW; sold-out marketing is not converted into a numeric tenancy figure."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-estruxture-cal3-review-8","attribute":"developer_operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies eStruxture in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"disposition":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"name":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"operator":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"province":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"],"record_kind":["pub-src-west-full-ad795eb98540","pub-src-west-full-b7acabaa58d5","pub-src-west-full-3532fa7727e7"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"eStruxture CAL-3","operator":"eStruxture","placement":null,"province":"Alberta","record_id":"ab-estruxture-cal3","record_kind":"campus"}
