{"city":"Rocky View County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-crusoe-crossfield-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Rocky View County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-crusoe-crossfield-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-06-09","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"status":"withdrawn","status_subject":"facility_or_project_lifecycle","unit":null,"value":"The county records withdrawal of the Lone Pine proposal at this site. A replacement site or revived project is not established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-crusoe-crossfield-review-3","attribute":"capacity","capacity_basis":"withdrawn_nonadditive_design","capacity_type":"mixed_generation_and_compute_design","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"each former module","qualifier":"Separate source-reported quantities are not additive.","scope":"phase","source_ids":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"status":"withdrawn","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The withdrawn concept paired generation modules of up to 200 MW with approximately 140–200 MW of computing per module, potentially across five modules. These are former design figures, not a current build commitment."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-crusoe-crossfield-review-4","attribute":"withdrawn_power_plan","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"status":"withdrawn","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The former design used gas-to-compute generation with a possible grid bridge; no operating supply is inferred after withdrawal."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-crusoe-crossfield-review-5","attribute":"former_developer","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies KALiNA Distributed Power in the operator or development role. This does not establish title to the underlying land."}],"disposition":"historical","field_provenance":{"city":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"disposition":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"name":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"operator":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"province":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"],"record_kind":["pub-src-west-full-a67ebd690774","pub-src-west-full-e8c4f7986810"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"KALiNA Lone Pine / former Crossfield Energy Park proposal","operator":"KALiNA Distributed Power","placement":null,"province":"Alberta","record_id":"ab-crusoe-crossfield","record_kind":"historical"}
