{"city":"Fox Creek","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-bitdeer-foxcreek-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Fox Creek, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-bitdeer-foxcreek-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-06-01","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"status":"under_construction","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Bitdeer announced groundbreaking on 1 June 2026. Its release targeted Q2 2027 energization, whereas the project page targets Q4 2027; the schedule remains inconsistent."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-bitdeer-foxcreek-review-3","attribute":"capacity","capacity_basis":"approved","capacity_type":"generation","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The plan pairs 101 MW of gas generation with roughly 100 MW of computing capacity. Bitdeer also reports a 99 MW grid interconnection approval. These different boundaries are not additive and do not establish operating IT capacity."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-bitdeer-foxcreek-review-4","attribute":"hybrid_grid_connected_self_supply","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The proposed compute load is supplied by on-site natural-gas generation, with flexibility to export power when mining is curtailed."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-bitdeer-foxcreek-review-5","attribute":"planned_system","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The planned thermal system circulates fluid through dry heat exchangers and fans; Bitdeer describes negligible routine water use."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-bitdeer-foxcreek-review-6","attribute":"developer","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Bitdeer Technologies Group in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"disposition":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"name":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"operator":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"province":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"],"record_kind":["pub-src-west-full-9218372b86a3","pub-src-west-full-d1aab1950e62"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Bitdeer Fox Creek","operator":"Bitdeer Technologies Group","placement":{"accessed_date":"2026-10-05","city":"Fox Creek","gazetteer_id":"5956869","gazetteer_modified_date":"2024-02-28","latitude":54.4001,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-116.8024,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/5956869/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Alberta","record_id":"ab-bitdeer-foxcreek","record_kind":"project"}
