{"city":"Rocky View County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-indus-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Rocky View County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-indus-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"status":"proposed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Indus is a proposed energy-and-data campus subject to a power-plant application. No final commissioning is established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-indus-review-3","attribute":"capacity","capacity_basis":"proposed","capacity_type":"generation","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"status":"proposed","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The application specifies 1,494 MW of generation and approximately 1,200 MW of normal supply to neighbouring data halls. These non-additive figures do not establish IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-indus-review-4","attribute":"behind_meter_with_grid_option","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"The design combines 100 reciprocating gas engines, 12 gas turbines and four steam turbines; the principal proposed supply is on site."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-indus-review-5","attribute":"planned_cooling_options","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The developer discusses closed-loop cooling and possible grey-water use as design work, not installed equipment."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-indus-review-6","attribute":"developer","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Beacon Data Centers / Indus Power Generation LP in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"disposition":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"name":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"operator":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"province":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"],"record_kind":["pub-src-west-full-f9af74184406","pub-src-west-full-b4a4ff452807","pub-src-west-full-3ed8cfb59cfa"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Beacon Indus Data Center Hub","operator":"Beacon Data Centers / Indus Power Generation LP","placement":null,"province":"Alberta","record_id":"ab-beacon-indus","record_kind":"campus"}
