{"city":"Sturgeon County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-heartland-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Sturgeon County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-heartland-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"status":"proposed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"The Heartland power project is presented in an AUC application. Beacon reports a municipal master development permit; provincial plant approval and physical completion are separate questions."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-heartland-review-3","attribute":"capacity","capacity_basis":"proposed","capacity_type":"generation","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"facility","source_ids":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"status":"proposed","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"The proposed generating plant totals 920 MW, with about 800 MW expected to serve the adjacent data halls under normal conditions. These are generation/supply quantities, not net server IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-heartland-review-4","attribute":"behind_meter_with_grid_option","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"Beacon proposes natural-gas generation using 200 Jenbacher J624 engines in 40 modules. A possible grid link remains a development workstream."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-heartland-review-5","attribute":"planned_cooling_options","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The proponent is considering recirculating cooling and grey-water reuse. No commissioned cooling configuration is established."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-beacon-heartland-review-6","attribute":"developer","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Beacon Data Centers / Heartland Power Generation LP in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"disposition":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"name":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"operator":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"province":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"],"record_kind":["pub-src-west-full-d1ca530df8a0","pub-src-west-full-9f96f9939d6a"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Beacon Heartland Data Center Hub","operator":"Beacon Data Centers / Heartland Power Generation LP","placement":null,"province":"Alberta","record_id":"ab-beacon-heartland","record_kind":"campus"}
