{"city":"Red Deer County","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ab-ahi-reddeer-review-1","attribute":"public_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Red Deer County, Alberta. City or regional reference only; no facility coordinates are published."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-ahi-reddeer-review-2","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"power_readiness","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"first_generation_phase","qualifier":null,"scope":"onsite_generation","source_ids":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"status":"under_construction","status_subject":"onsite_generation_phase","unit":null,"value":"Havenz describes the first generation phase as in construction and commissioning. This does not establish commissioned AI computing."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-ahi-reddeer-review-3","attribute":"capacity","capacity_basis":"design","capacity_type":"generation","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":"Separate source-reported quantities are not additive.","scope":"phase","source_ids":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":null,"value":"Havenz lists a 10 MW first generation block and a conditional 30 MW phased pathway. Both figures concern the energy programme; neither establishes operating IT load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-ahi-reddeer-review-4","attribute":"onsite_gas_and_grid_plan","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"status":"planned","status_subject":"power_supply_or_backup_configuration","unit":null,"value":"Havenz reports a 138 kV grid-connection programme at AESO Stage 3 and contracted natural gas for phased generation. These statements do not establish completed electrical energization."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-ahi-reddeer-review-5","attribute":"supported_planned_systems","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The developer presents immersion and direct-to-chip liquid cooling as supported design options, without evidence of a specific commissioned tenant hall."},{"accessed_date":"2026-10-05","assertion_id":"pub-ab-ahi-reddeer-review-6","attribute":"developer_operator","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"The reviewed source identifies Havenz Smart Communities / AHI Management in the operator or development role. This does not establish title to the underlying land."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"disposition":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"name":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"operator":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"province":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"],"record_kind":["pub-src-west-full-876a0be5273d","pub-src-west-full-e29f5bd9b352"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"AHI Red Deer","operator":"Havenz Smart Communities / AHI Management","placement":null,"province":"Alberta","record_id":"ab-ahi-reddeer","record_kind":"campus"}
