{"city":"Saint-Jérôme","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-WHITEFIBER-MTL3-1","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-08-12","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-357618831929"],"status":"reported_operating","status_subject":"facility_or_project_lifecycle","unit":null,"value":"The August 2026 filing states that MTL-3 became operational in November 2025; WhiteFiber acquired the Saint-Jérôme property in May 2026."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-WHITEFIBER-MTL3-2","attribute":"capacity","capacity_basis":"gross facility rating; not equivalent to IT load or measured demand","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-08-12","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":7,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-357618831929"],"status":"reported","status_subject":"reported_capacity","unit":"MW","value":"The filing describes MTL-3 as 7 MW gross."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-WHITEFIBER-MTL3-3","attribute":"capacity","capacity_basis":"tenant-contracted IT capacity, not incremental to gross facility power","capacity_type":"IT_load","category":"capacity","claim_kind":"reported","evidence_date":"2026-08-12","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":5,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-357618831929"],"status":"reported","status_subject":"reported_capacity","unit":"MW","value":"MTL-3’s Cerebras contract is for 5 MW IT load, within its 7 MW gross design."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-WHITEFIBER-MTL3-4","attribute":"cooling","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-8d509f68b9cd"],"status":"reported","status_subject":"cooling_configuration","unit":null,"value":"WhiteFiber’s MTL-3 page describes direct-to-chip liquid cooling, N+1 systems and carrier-neutral connectivity; exact physical route diversity is not independently established."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-WHITEFIBER-MTL3-5","attribute":"commercial","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2026-08-12","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-357618831929"],"status":"reported","status_subject":"commercial_disclosure","unit":null,"value":"The filing states Cerebras billing began November 1, 2025 at C$1.4 million monthly under a five-year contract; this is tenant-specific, not market pricing."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-quebec-east-357618831929"],"disposition":["pub-src-quebec-east-357618831929"],"name":["pub-src-quebec-east-357618831929"],"operator":["pub-src-quebec-east-357618831929"],"province":["pub-src-quebec-east-357618831929"],"record_kind":["pub-src-quebec-east-357618831929"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"WhiteFiber / Enovum MTL-3","operator":"WhiteFiber / Enovum Data Centers","placement":{"accessed_date":"2026-10-05","city":"Saint-Jérôme","gazetteer_id":"6138501","gazetteer_modified_date":"2016-06-22","latitude":45.7804,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-74.0036,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6138501/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Quebec","record_id":"QC-WHITEFIBER-MTL3","record_kind":"facility"}
