{"city":"Baie-Comeau","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-ARGO-BAIECOMEAU-1","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-04-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-3223b3b58afd"],"status":"operating_reported","status_subject":"facility_or_project_lifecycle","unit":null,"value":"Argo’s April 2026 filing for fiscal 2025 states that it owns and operates a data centre in Baie-Comeau."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-ARGO-BAIECOMEAU-2","attribute":"capacity","capacity_basis":"issuer-reported site power; not measured demand or AI IT capacity","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-04-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":15,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-3223b3b58afd"],"status":"reported","status_subject":"reported_capacity","unit":"MW","value":"Argo reports 15 MW of power capacity at Baie-Comeau."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-ARGO-BAIECOMEAU-3","attribute":"capacity","capacity_basis":"conditional total expansion ceiling; not an additional 23 MW","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-04-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":23,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-3223b3b58afd"],"status":"conditional_plan","status_subject":"reported_capacity","unit":"MW","value":"Expansion from 15 MW to 23 MW depends on a municipal power contract, according to Argo."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-ARGO-BAIECOMEAU-4","attribute":"power","capacity_basis":null,"capacity_type":null,"category":"power","claim_kind":"reported","evidence_date":"2026-04-30","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-3223b3b58afd"],"status":"reported","status_subject":"power_configuration","unit":null,"value":"Argo characterizes the site’s power capacity as 99% renewable and supplied from the nearby hydroelectric dam."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-QC-ARGO-BAIECOMEAU-5","attribute":"commercial","capacity_basis":null,"capacity_type":null,"category":"commercial","claim_kind":"reported","evidence_date":"2024-11-07","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-12eaf1663e07"],"status":"nonbinding_historical","status_subject":"commercial_disclosure","unit":null,"value":"In November 2024 Argo disclosed a nonbinding HPC-expansion letter of intent with BE Global Development, subject to further conditions."}],"disposition":"identifiable_facility","field_provenance":{"city":["pub-src-quebec-east-3223b3b58afd","pub-src-quebec-east-12eaf1663e07"],"disposition":["pub-src-quebec-east-3223b3b58afd","pub-src-quebec-east-12eaf1663e07"],"name":["pub-src-quebec-east-3223b3b58afd","pub-src-quebec-east-12eaf1663e07"],"operator":["pub-src-quebec-east-3223b3b58afd","pub-src-quebec-east-12eaf1663e07"],"province":["pub-src-quebec-east-3223b3b58afd","pub-src-quebec-east-12eaf1663e07"],"record_kind":["pub-src-quebec-east-3223b3b58afd","pub-src-quebec-east-12eaf1663e07"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Argo Baie-Comeau data centre","operator":"Argo Blockchain","placement":{"accessed_date":"2026-10-05","city":"Baie-Comeau","gazetteer_id":"5889745","gazetteer_modified_date":"2021-11-11","latitude":49.2168,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-68.1489,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/5889745/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Quebec","record_id":"QC-ARGO-BAIECOMEAU","record_kind":"facility"}
